Waterview Separation Private Drainage Investigation Q/A , Initial Business Case Development Healthy Waters Department (2018 to 2020). Photo shows a surcharging wastewater network at MH 9029047 (under Oakley Creek shared Path Bridge, Waterview Glade) pre separation. Regulatory Engineering Review Developments in flood plains and overland flow paths including review of proposed stromwater connections to the combined sewer networks Western Isthmus Water Quality Improvement Programme (WIWQIP) Wastewater and Stormwater Planning Advice, Catchment Optioneering with Watercare Services Ltd/Auckland Council Healthy Waters (2018 to Present) Okahu Bay Separation Private Drainage Investigation , Initial Business Case Development, Concept and Preliminary Design Review, Tender documentation review. (2018 to 2020) CANOPY Project management of the Westmere and Waterview - CANOPY reports including system performance WW network post separation Western Isthmus Water Quality Improvement Programme (WIWQIP) Private drainage investigations Cox’s Bay, Oakley Bollard Ave, Pt Chevalier WSL/HWD (2020-2021) Franklin Road Collingwood street Private drainage separation Designs and landowner approvals (land & Marine Ltd subcontracted to Brian Perry) 2016 to 2017 Picton Street Stormwater Upgrade Business case development, concept and preliminary design review, Tender documentation review. St Andrews Road SW upgrade and dry pond MSQA