Screen Shot 2021-10-12 at 10.39.22 AM.png

Waterview Separation

Private Drainage Investigation Q/A , Initial Business Case Development Healthy Waters Department (2018 to 2020). Photo shows a surcharging wastewater network at MH 9029047 (under Oakley Creek shared Path Bridge, Waterview Glade) pre separation.

 
Screen Shot 2021-10-14 at 2.03.19 PM.png

Regulatory Engineering Review

Developments in flood plains and overland flow paths including review of proposed stromwater connections to the combined sewer networks

 
Screen Shot 2021-10-12 at 10.43.15 AM.png

Western Isthmus Water Quality Improvement Programme  (WIWQIP) 

Wastewater and Stormwater Planning Advice, Catchment Optioneering with Watercare Services Ltd/Auckland Council Healthy Waters  (2018 to Present)

 
Screen Shot 2021-10-12 at 10.47.14 AM.png

Okahu Bay Separation

Private Drainage Investigation , Initial Business Case Development, Concept and Preliminary Design Review, Tender documentation review. (2018 to 2020)

 
Screen Shot 2021-10-12 at 10.45.31 AM.png

CANOPY

Project management of  the Westmere and Waterview  - CANOPY reports including system performance WW network post separation

 
Pt Chev.PNG

Western Isthmus Water Quality Improvement Programme  (WIWQIP)

Private drainage investigations Cox’s Bay, Oakley Bollard Ave, Pt Chevalier  WSL/HWD (2020-2021)

 
Screen Shot 2021-10-12 at 10.53.24 AM.png

Franklin Road Collingwood street Private drainage separation

Designs and landowner approvals  (land & Marine Ltd subcontracted to Brian Perry) 2016 to 2017

 
Screen Shot 2021-10-12 at 10.48.30 AM.png

Picton Street Stormwater Upgrade

Business case development, concept and preliminary design review, Tender documentation review.

 
Screen Shot 2021-10-12 at 11.30.51 AM.png

St Andrews Road

SW upgrade and dry pond MSQA